多支撑挡土结构考虑开挖过程的计算方法(“C”法) 被引量:9

A Calculating Method Considered the Effect of Staged Excavation for Multi - braced Retaining Wall -"C"Method
全文增补中
导出
摘要 软土地基上的深基坑支护结构都采用多支撑形式,本文采用土体弹簧系数K=Cz^1/2(即通常称之为“C”法),并考虑分步开挖逐层支撑的施工过程对支撑力、桩身内力及位移的影响,推导了以挠曲线方程为基础的计算方法,是继“m”法之后的又一发展.该法便于计算,对于少于三道支撑的情况,用手算也很方便,对于更多支撑的情况则可采用电算.“C”法比“m”系数法更适合于软土地基,计算结果与实测位移曲线很吻合. Multi-Braced retaining structures have been widly employed in deep excavation. A calculating method using spring factor of K = C is presented in this paper, having taken into account the effect of staged excavation upon the bracing force, and the internal force and displacement of retaining wall. This is a development following 'm' method. For soft soil, the results calculated from 'C' method are consistent with the measured value better than that form 'm' method.
机构地区 同济大学地下系
出处 《建筑结构》 CSCD 北大核心 1996年第7期15-21,共7页 Building Structure
关键词 深基坑 支挡结构 开挖 多支撑 弹簧地基 retaining structure multistorey bracing staged excavation 'C' method
  • 相关文献

参考文献1

二级参考文献3

共引文献15

同被引文献41

引证文献9

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部