摘要 结合汕梅高速公路梅州至梅南段边坡防护工程实例,介绍对黑色碳质页岩高边坡在不利季节尤其是雨季施工时动态设计、动态施工的方法,采用由上至下、分级开挖、边开挖、边防护的原则,提出先排基岩裂隙水,再喷素混凝土,后进行锚杆和锚索格子梁施工的加固处治措施。工程实践结果表明,采用该方法施工效果良好。 The Meizhou to Meinan section of the Shantou--Meizhou Expressway lies in the east of Guangdong Province, which connects the northeast and southeast mountainous areas of Guangdong littoral region. Its construction is important in completing the expressway network, providing access to northeast mountainous areas, improving the investment environment, and further accelerating economy development. The route is 12.288 km long with designed speed 80 km/h, and four lanes in both directions and with whole cross section. The subgrade width is 24.5 m. In the K1+300 - K1+600 section, the cut depth of right side is more than 30 m and the left side is more than 50 m. This article is combined with the slope prevention example in this section, the methods of dynamic design and construction for with high-cut slope with carbonaceous shale in unfavorable season are presented. Because construction time is limited and rain is often heavy in summer, this section is constructed during period of light rain. Based on slope datum, preliminary slope treatment is designed. Then the nature of rock conditions, the rock flaw water increment and the directions of rock layer etc. are continually observed. As a result, the design can be adjusted in time according to new conditions. The principle of from up to down, excavation and prevention for each stage are put forward. In addition, draining of rock flaw water, spraying concrete and strengthening action of anchor-stick grid beam are adopted. In the late of 2003, this expressway was completed and slope prevention measures were adopted. K
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2006年第2期392-398,共7页 Chinese Journal of Rock Mechanics and Engineering
关键词 边坡工程 边坡防护 碳质页岩 动态设计 动态施上 锚杆(锚索)格子梁 slope engineering, slope prevention carbonaceous shale dynamic design dynamic construction. anchor-sticks grid beam
  • 相关文献

参考文献11

二级参考文献29

  • 1朱正武,李红超.预应力锚索与混凝土地梁在边坡治理中的运用[J].探矿工程(岩土钻掘工程),2001,28(S1):107-109. 被引量:7
  • 2林在贯.岩土工程手册[M].北京:中国建筑工业出版社,1994..
  • 3励国良.锚索抗滑桩与滑坡相互作用的计算[A]..滑坡文集(第十三集)[C].北京:中国铁道出版社,1991..
  • 4铁道第一勘察设计院.京九复线柳城隧道施工设计图[R].,2000..
  • 5Sarma K S. Stability analysis of embankments and slopes[J].J.Geotech.Am.Soc.Civ.Engrs,1979,105(12):1511-1524.
  • 6Hoek E.General two-dimensional slope stability analysis[A].Analytical and Computational Methods in Engineering Rock Mechanics[C].95-,Allen and Unwin,London,1987.
  • 7马燕合.露天矿边坡稳定性电算分析[R].徐州:中国矿业学院采矿系,1987.
  • 8崔政权 李宁.边坡工程[M].北京:中国水利水电出版社,1999..
  • 9沈珠江.桩的抗滑阻力和抗滑桩的极限设计[J].岩土工程学报,1992,14(1):51-56.
  • 10周昌寿.露天矿边坡稳定[M].徐州:中国矿业大学出版社,1990..