摘要
本文介绍了艺苑皇冠假日饭店的给排水设计概况与1995年1~9月的实测用水量资料,并将设计用水量与实测用水量进行了对比分析。
In this paper the water supply and drainage system design of Yiyuan Crown Holiday Inn is presented briefly and the practical measured data of water consumption during january to september 1995 are listed. The designed water demand is compared with the measured data.
出处
《给水排水》
CSCD
1996年第8期36-40,共5页
Water & Wastewater Engineering