摘要
为了验证瀑布沟水电站水轮机模型的水力性能,进行了模型验收试验。其内容包括仪器仪表率定、效率试验、出力试验、空化试验、流态观测、装置空化及变空化下的压力脉动试验、补气试验、轴向水推力、蜗壳压差、飞逸特性等试验。验收结果表明:模型水轮机性能及换算到原型的水轮机性能满足合同要求。
In order to verify the hydraulic characteristics of the turbine model for Pubugou Hydropower Station, the acceptable model test is made. The test involves the instrument and meter calibrating, the efficiency test, the output test, the cavitation test, the flow condition survey, the water pressure fluctuation test, the air admission test, the axial push test, the spiral case pressure difference test and the runaway behavior test. The conclusion of the acceptance test is that both the behaviors of the model turbine and the converted to the real turbine accord with the contract demands.
出处
《水电站机电技术》
2006年第1期40-43,共4页
Mechanical & Electrical Technique of Hydropower Station
关键词
水轮机模型
验收试验
瀑布沟水电站
turbine model
acceptance test
Pubugou Hydropower Station