期刊文献+

龙抬头泄洪洞反弧段空化空蚀研究综述 被引量:9

Summary of study on ogee-section cavitation in longtaitou spillway tunnels
下载PDF
导出
摘要 根据国内外大量的工程实例,在前人研究的基础上,系统总结了龙抬头泄洪洞反弧段空化特性和空蚀成因,分析了反弧段掺气减蚀和抗蚀体型的现有成果。体型优化和掺气设施研究,数值试验具有花费少、适应能力强、提供的流场资料详细、便利方案选择等优点。 Based on the previous research since 1981, this paper has given a brief introduction and comments on cavitation of ogee-section in spillway tunnels. Cavitation free configuration of high head flood tunnel, air entrainment and cavitation alleviation are reviewed. Complicated tunnel flow with aeration facilities can be simulated successfully by the combination of the double equations turbulent model, VOF method. The simulation supplies a new measure and method for the study on the flood discharge tunnel.
作者 纪伟
出处 《水科学与工程技术》 2006年第1期51-53,共3页 Water Sciences and Engineering Technology
关键词 龙抬头泄洪洞 反弧段 空蚀 掺气减蚀 spillway tunnel ogee-section cavitation air entrainment and cavitation alleviation
  • 相关文献

参考文献18

二级参考文献43

共引文献76

同被引文献100

引证文献9

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部