高地应力区隧洞开挖效应动态仿真分析

Dynamic emulation analysis on tunnel excavating effect in high geo-stress zone
下载PDF
导出
摘要 高地应力下的隧洞开挖过程中,围岩将产生动态的变化。以锦屏二级水电站引水隧洞为例,采用非线性三维有限元法,对其动态开挖过程进行了仿真模拟,分析开挖后的围岩应力分布与变化规律、变形规律与特征以及塑性区范围,为合理设计和施工安全提供依据。 On the process ot tunnel excavauon in high geo-stress zone , surrounding rocks will have dynamic drift. Taking diversion tunnel in Jinplng Cascade 2 Hydropower Station as an example, the non-linear three-dimensional finite element method is used to simulate the dynamic excavating process and analysze stress distribution, deformation and plastic range of the surrounding rock, which can be the reference to the construction safety and appropriate designing.
出处 《黑龙江水专学报》 2005年第4期20-22,共3页 Journal of Heilongjiang Hydraulic Engineering College
关键词 高地应力 开挖效应 掌子面 非线性三维有限元 数值分析 high geo-stress excavating effect driving face non-linear three-dimensional finite element numerical analysis.
  • 相关文献

参考文献6

二级参考文献8

共引文献290

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部