期刊文献+

基准轴线投测后的检测精度要求和归化计算 被引量:1

Testing precision demand of a projected datum line and its modified computation
下载PDF
导出
摘要 结合高层建筑工程施工的生产实际,在施工条件限制的情况下,以15″或20″作为投测后三点是否在一直线上的限差要求来推证投测基准轴线的检测精度指标,以及为提高轴线投测精度进行归化改正的计算简捷公式,并通过实例进行了验证分析,解决了高层建筑施工中基准轴线投测的实际问题。 Considering the constraint of the high-rise building construction conditions, the testing procedure for precision of a projected datum line, which allowed tolerance of projected three points in a line is 15″to 20″, is deducted through an example of a high-rise building construction. Then, the simplified formulae for improveing project precision with modified computation are derived in detail and rerified by an example.
出处 《南京工业大学学报(自然科学版)》 CAS 2006年第2期104-106,共3页 Journal of Nanjing Tech University(Natural Science Edition)
关键词 基准线 轴线投测 归化计算 逐次趋近法 直接法 datum axis axis projection modifying computation method of getting close step by step method of getting close directly
  • 相关文献

参考文献3

  • 1高俊强.高层建筑工程测量若干问题的研究[D].南京:河海大学土木工程学院,1999.
  • 2武汉测绘科技大学测量学教研组.测量学[M].北京:测绘出版社,2002.
  • 3李青岳,陈永奇.工程测量学[M].北京:测绘出版社,1987.

共引文献2

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部