摘要
结合内蒙古境内208国道锡赛段朱日河中桥的工程实践,介绍了采用土工格栅(网)处理桥头跳车的设计施工方案以及施工中应注意的问题。
According to the construction practice of duri He Medium Bridge in the Xi-Sai Section of National Highway No. 208 within the boundary line of Inner Mongolia, this article discusses the design plans and construction for dealing with bump at bridge-head with geogrid and some issues needing attention under construction,
出处
《内蒙古公路与运输》
2005年第4期38-39,共2页
Highways & Transportation in Inner Mongolia
关键词
土工格栅
桥梁
桥头跳车
geogrid
vehicle-jumping at abutments