建设项目全要素集成造价管理模型研究 被引量:2

Research On The Model of Construction Project Total Factors Integrated Cost Management
下载PDF
导出
摘要 根据工程量清单招标的工程造价构成及费用发生特点,对合同项目的计价活动进行模块划分;运用建设项目全要素集成造价管理的理论与方法,完成了工程造价基本参数模块划分;便于准确、及时、完整地收集实时数据,进行偏差分析和造价预测;同时结合工程造价动态控制原理、工作结构分解方法等构建了建设项目全要素集成造价管理模型。 Analyzing the characteristic of the activity of the oonstruction cost on the evaluating mode of oonstruction works based on bill of quantities, the paper divides the construction cost into five modules on the evaluating mode of construction works. It studies the way of calculating about four basic parameters of construction cost by utilizing the Earned Value Concept. Utilizing the Earned Value Concept, the method of WBS, Analyzing the deviation and forecasting the cost of unfinished construction project. The paper builds the the model of construction project total factor integrated cost management.
作者 朱建君
出处 《基建优化》 2005年第6期35-38,共4页 Optimization of Capital Construction
关键词 全要素 集成 造价管理 模型 total factors integrated rest management model
  • 相关文献

参考文献8

二级参考文献1

共引文献52

同被引文献25

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部