摘要 结合重庆市轻轨较新线大坪车站大跨度地下空间DK7+692断面施工支护体应力监测的工程实例,阐述了该大跨度地下空间支护结构的参数选择、地下空间的开挖方法、支护体结构的应力量测方法及测试手段;分析了支护体初期支护工字钢拱应力、锚杆轴力、喷射混凝土内应力、临时工字钢支撑应力、二次衬砌钢筋应力等测试结果和变化规律;确定了工字钢拱应力急剧增大而可能引起支护体系失稳的原因。在此基础上,针对施工中出现的问题,及时调整了施工方案及支护措施,控制了支护体系的失稳,避免施工中险情的发生,实现了隧道的信息化施工和施工安全。 Combined with the real example of monitoring pressure on the supporting system in the long span underground space of DK7 + 692 section at Jiao - Xin line of Chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting I - steel, axial stress of bolt, stress of shot - concrete, supporting pressure of temporary I - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of I - steel was determined. Based on this, considering the real problem, the construction plan and the support system is changed, the deformation of support system was under control and the danger was avoided, the informative construction and construction safety were realized.
出处 《重庆建筑大学学报》 EI CSCD 北大核心 2006年第1期67-70,共4页 Journal of Chongqing Jianzhu University
基金 国家自然科学基金重点项目(50334060) 国家自然科学基金项目(50474025) 重庆市应用基础研究项目资助 重庆大学研究生创新实践基金项目
关键词 新奥法 监测 大跨度 支护 稳定性 NATM monitoring long span support stability
  • 相关文献

参考文献9

二级参考文献53

共引文献249

同被引文献48

引证文献5

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部