明挖顺筑(土钉墙+锚索放坡支护)地铁车站监测成果分析 被引量:1

Analysis on Monitoring Results of Open-cut Metro Stations Reinforced by Soil Nails and Anchoring Cables
下载PDF
导出
摘要 深圳地铁一期工程少年宫站开挖基坑围护结构采用1∶0.3的放坡结合土钉加预应力锚索联合支护体系。根据设计、施工需要,对该站进行了地表沉降、地中水平位移、土钉及锚索应力、水位、基底回弹等项监测。通过对各项监测成果的分析、预测和反馈,为信息化设计和施工提供了可靠的依据。 Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro. On basis of the requirements of the design and construction of the station, ground surface settlement, horizontal displacement of ground, stress of soil nails and anchoring cables, water table and rebound of foundation floor are monitored. By means of analysis on and prediction and feedback of the monitoring results, reliable reference can be provided for the information-aided design and construction of Metro stations.
出处 《隧道建设》 2006年第1期14-17,共4页 Tunnel Construction
关键词 土钉墙 锚索支护 地铁车站 监测成果 分析 soil nails anchoring cable Metro station monitoring result analysis
  • 相关文献

参考文献2

共引文献7

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部