摘要
介绍了武汉市中山广场地下过街道在穿越浅埋、富水、软弱地层时所采用的施工及配套技术。主要包括:洞内真空降水技术、双侧壁导坑施工法、长管棚施工技术等。
The article describes the construction technology and the other assisting technologies applied in the construction of the shallow-buried street-crossing underpass underneath Zhongshan square in Wuhan city, which is located in soft and water-rich ground. The major contents described in the article include technology of vacuum dewatering inside the tunnel, technology of double side drift construction method and long pipe roof construction technology.
出处
《隧道建设》
2006年第1期70-73,共4页
Tunnel Construction
关键词
含水软弱地层
真空降水
长管棚
双侧壁导坑法
soft ground containing water
dewatering by vacuum means
long pipe roof
double side drift method