摘要
介绍了如何利用新材料、先进的设计结构、适合的操作方法,彻底解决500 kV四联耐张绝缘子串无法整串带电更换的老大难问题。此课题为山西省电力公司2004年科技项目。
This paper introduced how to use new material, the advanced design structure and adaptive operating method. The Problem for live working tools for transposing strain four insulators chain on 500 kV energized transmission line is completely solved. This is a technological project of Shanxi Power Company in 2004.
出处
《华北电力技术》
CAS
2006年第2期1-3,44,共4页
North China Electric Power
关键词
带电更换
500
KV
四联耐张绝缘子串
工具
live working, 500 kV, transposing strain four insulators chain, tool