期刊文献+

大型循环水体置换时间的实验研究 被引量:5

Study about the Replaced Time of Large Circulated Water Body
下载PDF
导出
摘要 论述了水体置换与置换时间特性及其影响因素,并结合工程实例,给出了基本置换时间和附加置换时间的计算思路和方法,用于大型循环水体特性研究和计算。其中水体总置换时间为基本置换时间和附加置换时间之和,它们可根据流体运动的连续性原理、水体工作平衡和流场分布进行计算。水体置换时间与水体体型尺寸、进出水口的数量、尺寸、方位、水体平衡方式和条件等诸多因素有关,应根据工程实际情况确定计算。 To keep a large circulated water excellent quality, reasonable replaced time is one of the key factors. Accordingly, based on the project example ,this paper discusses the characters and the effect factors of the water replaced time, gives numerical method and a fundamental thought of replaced time and an additional replaced time, which is used to study characters of the circulated water body. Add the fundamental of replaced time to an additional, we can get total replaced time. Based on continuous principle of fluid motion ,we can caculate water balance and veocity. Dimensions of water body, quantity of water import, way of water balance and condition etc. affect the water replaced time, we should caculate it in accordance project.
出处 《太原理工大学学报》 CAS 北大核心 2006年第1期67-70,共4页 Journal of Taiyuan University of Technology
关键词 循环水体 置换时间 计算 基本置换时间 附加置换时间 circulated water replaced time caculate
  • 相关文献

参考文献3

  • 1孔珑.工程流体力学[M].济南:山东工业大学出版社,1995..
  • 2阎庆绂.山西省万家寨引黄工程联接段备用水源呼延调蓄工程水工模型试验报告[R].太原理工大学,2004..
  • 3孟晋忠.不规则陆地边界循环水体中的环流特性[R].太原理工大学,2005..

共引文献3

同被引文献35

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部