摘要
根据建井和生产过程中掌握的新资料,修改了勘探报告中确认的构造形态。为南五采区合理布置综采工作面提供了可靠依据。
According to the new information form shaft construction and coal production,the geological structure descrifed in the geological exploration report was revised,so reliable ba-sis was provided for the arrangement of fully mechanized face in south mine district.