期刊文献+

徐州绿地世纪城中水回用方案优选

Opitimised Project of Reclaimed Wastewater Recyling in Xuzhou Greenland Century City
下载PDF
导出
摘要 为在大型高标准综合住宅社区的徐州绿地世纪城实施中水回用,从处理工艺、建设规模、投资、运行成本等方面对“徐州市三八河污水处理厂中水回用工程”及“徐州绿地世纪城自建中水处理站”2套中水回用方案进行优化比选,并给出合理的推荐方案。 Xuzhou greenland century city located in the larger-hlgh standard for-integrative uptown will carry reclaimed wastewater recycling int execution. The two project "reclaimed wastewater recycling project of Xuzhou Sanba River Wastewater Treatment" and "reclaimed wastewater treatment constructed by Xuzhou Greeland century City" were compared with from treatment process, building size ,investment, oprating cost and so on. Finally ,rational suggested design was put forward.
作者 耿广敏 刘静
出处 《江苏环境科技》 2005年第B12期76-78,共3页
关键词 中水回用 方案 优选 Reclaimed wastewater recycling Project Optimised
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部