黄河沙坡头枢纽软岩坝基开挖施工质量控制 被引量:1

Quality Control of Soft Stratum Dam Foundation Excavation of Shapotou Key Water Control Project
下载PDF
导出
摘要 由于坝基软岩的存在,给沙坡头枢纽工程的建设带来了一定的困难。在施工过程中,针对枢纽坝基软岩的特点,经过反复实践与摸索,采取了预留保护层、限制爆破、限时保护层开挖、基坑排水等措施,尽量减少对基岩的扰动破坏,使之保持天然状态,在坝基软岩的处理方面,取得了比较好的效果,保证了工程质量。 The Shapotou Key Water Control Project has some difficulties in its construction due to the soft stratum of dam foundation. During the construction, it has adopted the measures of reserving protective stratum, limiting explosion, limiting the excavation time of protective stratum and foundation pit drainage, trying to reduce the disturbance of bedrock and keeping it in a natural statement after repeatedly practicing and fumbling in the light of the soft stratum character of the project. It has achieved fairly good effects on the treatment of soft stratum and guaranteed the quality of the project.
出处 《人民黄河》 CAS 北大核心 2005年第11期48-50,共3页 Yellow River
关键词 软岩 坝基开挖 质量控制 沙坡头枢纽工程 soft stratum, dam foundation excavation, quality control, Shapotou Key Water Control Project
  • 相关文献

同被引文献21

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部