期刊文献+

基于随机NewWave理论的自升式平台结构响应极值统计分析 被引量:2

Statistical Analysis of Extreme Response of jack-up Platform Based on Random NewWave Theory
下载PDF
导出
摘要 本文以风暴状态下自升武平台为研究对象,借助随机NewWave理论给出了给定波面极值时平台结构随机动力响应极值概率特征分析步骤。研究了平台结构随机动力响应极值统计分布随最大波面极值的演化规律,确定出两种具有统一形式的概率分布,并对其进行有效统计描述。通过对平台结构随机动力响应极值统计分布参数与波面极值之间映射关系的模拟,建立起平台结构随机动力响应极值的概率特性数值仿真器。计算结果表明,本文所提供的方法以有限次结构分析为代价,可完成对任意给定最大波面极值时平台结构随机动力响应极值概率特性的有效模拟,从而为进一步建立高效、实用的结构动力可靠性分析模型奠定了必要的基础。 Based on NewWave theory, a statistical analysis of extreme response of Jack-up platform subjected to random wave loading with given crest elevation is performed in this paper. An investigation on the trend of statistical distribution of the extreme response is given, and two probabilistic functions are proposed to represent it. The paper puts forward a numerical method to simulate the relationship between extreme response and crest elevation, which can be used to estimate the statistical parameters of extreme response of jack-up platform related to any given crest elevation. The results of engineering example show that the presented method can improve the efficiency of structural dynamic reliability analysis greatly with decreasing the amount of stuctural analysis.
机构地区 中国石油大学
出处 《中国造船》 EI CSCD 北大核心 2005年第B11期55-61,共7页 Shipbuilding of China
基金 高等学校博士学科点专项科研基金资助项目(20030425014)
关键词 自升式平台 NewWave理论 极值响应 jack-up platform NewWave theory extreme response
  • 相关文献

参考文献4

  • 1徐长航,陈国明,谢静,吴枝国.风暴状态下自升式平台非线性动力分析模型[J].石油大学学报(自然科学版),2003,27(4):80-83. 被引量:17
  • 2徐长航.[D].石油大学,2004.
  • 3Tromans P S,Anaturk A,Hagemeijier P.A new model for the kinematics of large ocean waves-application as a design wave[A].Proc.of the First International Offshore and Polar Engineering Conference,Edinburgh,1991,3:64-71.
  • 4Taylor P H,et al.Time domain simulation of jack-up dynamics with the extreme of a gaussian process[A].Proc.of the14th International Conference on Offshore Mechanics and Arctic Engineering,1995,1:313-319.

二级参考文献13

  • 1威尔逊JF 杨国金 等译.海洋结构动力学[M].北京:石油工业出版社,1991..
  • 2中国船级社.海上移动平台入级与建造规范[M].北京:人民交通出版社,1993..
  • 3..海上固定式平台的规划、设计与建造(API RP 2A)[S].美国石油学会,1993..
  • 4威尔逊J F 杨国金等译.海洋结构动力学[M].北京:石油工业出版社,1991..
  • 5.海上固定式平台的规划、设计与建造(API RP 2A)[S].[S].美国石油学会,1993..
  • 6DIER A F, MORANDI A C, et al. A comparison of jacket and jack-up structural reliability [J], Marine Structures,2001,14: 507 - 521.
  • 7CHRISTIAN Perol, MEIMON Yves. Cyclic storm loading soil-structure interaction for a three independent leg jack-up[A]. In: The Jack-up Drilling Platform: Design, Construction and Operation[C]. London: Elsevier Applied Science Pub, 1990.
  • 8MORANDI A C, SMITH I A A, VORK G S. Reliability of jack-ups under extreme storm condition[J], Marine Structures, 2001, 14:523-536.
  • 9TROMANS P S, ANATURK A, HAGEMEIJIER P. A new model for the kinematics of large ocean waves-application as a design wave[R], Proc 1st offshore and polar engineering (ISOPE)conference,Edinburgh, 1991.
  • 10PAUL H Taylor, JONATHAN Philip, LEON A, et al.Time domain simulation of jack-up dynamics with extremes of a gaussian process[J]. Proceeding of 14th OMAE, 1995,(1): 313-319.

共引文献16

同被引文献5

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部