张力腿平台安装分析 被引量:2

Fabrication and Installation for TLP
下载PDF
导出
摘要 张力腿平台的制造和安装包括陆地建造,船体和组块干拖至连接水域,水上对接,最后与张力腿连接固定。本文在分析制造和安装的几个过程的同时,着重论述了张力腿平台的海上对接,湿拖,充水就位、与张力腿的连接等海上安装过程,为今后开展张力腿平台的安装设计提供参考。 The TLP fabrication and installation include the construction in shipyard, loadout, dry tow, integration, wet tow, and site connection. In this paper, all these phases are discussed. But, it is emphasized that mating in sea wet tow, pre-ratcheting, ratcheting and TLP connection are discussed.
作者
出处 《中国造船》 EI CSCD 北大核心 2005年第B11期457-463,共7页 Shipbuilding of China
关键词 张力腿平台 安装 湿拖 对接 TLP installation wet tow mating
  • 相关文献

参考文献4

  • 1API RP 2T.Recommended Practice for Planning,Designing,and Constructing Tension Leg Platforms[S].2nd Edition,1997[S].
  • 2API RP 2A.Recommended Practice for Planning,Designing,and Constructing Fixed Platforms-Working Stress Design[S].21 st Edition,2000.
  • 3ABS MODU.Rules for Building and Classing Mobile Offshore Drilling Units[S].1997.
  • 4Offshore Technology Conference (OTC 14178).

同被引文献4

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部