摘要
针对半连铸的生产扩大,增加炉子设备,供电增容及原设计的不足之处进行供电系统改造,以满足扩大生产的需要。
Proceeding from the Consideration of the Production enlargement of semi - casting,the increasement of stove equipment,capacity expansion of power supply as well as the shortcomings of initial design, Guangtong has carried out the retrofitting for the power supply system to meet the need of production.
出处
《冶金丛刊》
2006年第1期31-33,共3页
Metallurgical Collections
关键词
供电
增容改造
负荷计算
运行分析
power supply
capacity expansion and retrofitting
charge calculation
running analysis