结合地质条件,通过工程设计、施工组织设计与经济分析,本文对某供水隧洞采用钻爆法及TBM全断面掘进机施工方案进行了论证。
By the analysis of project design, construction organization design and economical efficiency of a long water supply tunnel, the author demonstrates the construction scheme of drilling and blasting method and TBM gross section digging in method under the geological conditions.
出处
《施工技术》
CAS
北大核心
2006年第2期67-69,共3页
Construction Technology
关键词
隧道工程
方案论证
TBM
钻爆法
tunnel engineering
scheme demonstration
TBM
drilling and blasting method