期刊文献+

重庆走马岭岩溶隧道涌水量初步研究 被引量:16

A PRELIMINARY STUDY OF WATER INTRUSION IN ZOUMALING KARST TUNNEL,CHONGQING
下载PDF
导出
摘要 隧道涌水问题普遍存在,从隧道的施工到竣工运行都受其影响,特别是在南方岩溶地区尤为严重。根据勘察资料,走马岭隧道穿越可溶岩段(含断层破碎带)长1525m,占隧道总长的62%,极易发生隧道涌水事故。本文结合已开挖段隧道涌水的实时监测数据及前期工程勘察资料,对隧道涌水做出初步预测评价,为以后的施工提供依据。 The water intrusion is a common problem in tunnels, especially in southern karst area. It affects the whole process of tunnel construction and operation. According to the survey data,1525 -meter long( 62% of total length of Zoumaling tunnel) karst sector ( including fault fracture zone ) is prone to water intrusion. This paper presented a preliminary prediction of water discharge, which may be caused by continued tunnel excavation, based on real - time discharge monitoring data of excavated tunnel and project surveys. The results provide guidelines for control of potential water intrusion.
出处 《工程地质学报》 CSCD 2006年第1期68-71,共4页 Journal of Engineering Geology
关键词 岩溶区 隧道涌水 预测评价 Karst region Tunnel water discharge, Prediction
  • 相关文献

参考文献10

二级参考文献27

共引文献204

同被引文献214

引证文献16

二级引证文献252

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部