东津水电站溢洪道左岸高边坡变形异常的成因解析 被引量:2

Cause Analysis for the Deformation Abnormity of Steep Slope of Spillway Left-bank in Dongjin Hydropower Station
下载PDF
导出
摘要 在对东津水电站溢洪道左岸高边坡变形监测资料分析时发现,2003年6月的抗剪桩水平位移过程线出现了较大幅度的跳跃。为查明原因,保证高边坡的稳定运行,分别采用统计模型和分形几何方法进行了成因分析,并认为造成该监测值发生突变的主要因素是强降雨。 Through the deformation monitoring data analysis for the steep slope of spillway left-bank in Dongjin Hydropower Station, a big jump of horizontal displacement of the shear-resistant pile in June 2003 is noticed. In order to find out the causes and make sure the stability of the steep slope, statistical model and fractal geometry theory are used in the cause analysis. It is shown that the jump of horizontal displacement is mainly caused by strong rainfall.
出处 《水电自动化与大坝监测》 2006年第1期51-53,74,共4页 HYDROPOWER AUTOMATION AND DAM MONITORING
基金 国家自然科学基金重点资助项目(50139030)
关键词 高边坡 位移突变 定性分析 统计模型 分形几何 steep slope jump of displacement qualitative analysis statistical model fractal geometry
  • 相关文献

参考文献1

二级参考文献5

  • 1潘卫平,硕士学位论文,1995年
  • 2团体著者,1993年
  • 3林振山,长期预报的相空间理论和模式,1993年
  • 4林鸿溢,分形论.奇异性探索,1992年
  • 5刘式达,非线性动力学和复杂现象,1989年