三峡大坝左厂14号坝段安全监测资料分析 被引量:1

Safety Monitoring Data Analysis for Dam Block 14 of Three Gorges Left-bank Hydropower Station
下载PDF
导出
摘要 三峡大坝左厂14号坝段及其基础是三峡大坝安全监测系统选择的关键部位。通过监测成果对运行期的左厂14号坝段及其基础工作性态进行了全面分析。监测结果表明:坝体及基础变形稳定,防渗效果满足设计要求,坝体应力和温度分布合理。目前建筑物工作状态正常,应力和变形均在设计允许范围内。 Dam block 14 and its foundation of the Three Gorges Left-bank Hydropower Station are chosen as a key part for the safety monitoring system. The work behavior of dam block 14 and its foundation during the operation period is analyzed comprehensively. The monitoring results show that the block and its foundation are stable, the effect of water retaining is satisfied, and the distribution of stress and temperature is reasonable. At present, the work behavior of the dam is normal.
作者 姚红兵 周扬
出处 《水电自动化与大坝监测》 2006年第1期58-61,81,共5页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 三峡工程 大坝安全监测 工作性态 Three Gorges Project dam safety monitoring work behavior
  • 相关文献

同被引文献7

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部