摘要
介绍了城市地面沉降产生的原因,指出过量开采地下水是导致地面沉降的最主要因素,合理地设计开采量是控制地面沉降的主要手段。为此,提出了用超固结土的前期固结压力作为控制地下水开采量的计算方法。
Discusses the reasons of the city ground subsidence and points out the major reason caused ground subsidence is over-exploited the ground water as well, so it is important that design the reasonable quantity of exploiting groundwater for control the ground subsidence. So far, it is suggested that the calculation could be available for control exploiting the groundwater by use of parameter of prophase consolidation pressure of over-consolidated soils.
出处
《山东冶金》
CAS
2005年第6期48-49,共2页
Shandong Metallurgy
关键词
地面沉降
地下水开采
超固结土
前期固结压力
ground subsidence
exploitation of groundwater
over-consolidated soil
prophase consolidation pressure