摘要
为充分开发松阳松荫溪干流水力资源,在松阳县境内松荫溪河段上拟建4级水电站.修建水电站后,将改变松荫溪河道的水面曲线,从而影响河道行洪和公路交通,各电站的出力也与电站间水面曲线有关.为此,利用HEC-RAS软件对松荫溪梯级水电站建坝前后的水面曲线进行计算分析,为工程设计提供了依据.
In order to develop the water resources of Songyinxi, 4 scale power stations will be buih along Songyinxi. The stations will affect the water surface, the traffic-way and discharge as well. This paper introduces software- HECRAS developed by Hydrologic Engineering Center (HEC), which simulates the project of Songyinxi, specially the water surface after the dam construction, trying to provide technical support.
出处
《浙江水利水电专科学校学报》
2005年第3期22-24,26,共4页
Journal of Zhejiang Water Conservancy and Hydropower College