渌水特大桥的施工技术要点

The main construction technologies for Lushui super major bridge
下载PDF
导出
摘要 设计时速为200km/h的浙赣线渌水特大桥,主跨结构形式为42m+2×64m+42m单箱单室预应力混凝土双线连续梁,实体桥墩,桩基础。文章主要介绍了该桥施工的一些关键技术,包括深水基础施工的钢管桩平台和钢板桩围堰技术,基桩施工的溶洞和斜岩处理方法;主梁施工的菱形挂篮施工技术、其液压走行系统以及荷载试验等;主梁0#块施工的水上浮吊及降温养护措施;主梁合龙段施工等。该桥的施工技术和取得的经验可供同类桥梁施工参考。 Designing Zhejiang Jiangxi line Lushui super major bridge of 200km/h, the main step structure form are 42m+2×64m+42m single box and room prestressed concrete double-line continuous roof beam, the entity pier, peg foundation. This text has introduced some key technology of constructing in this bridge mainly, mainly including a platform of steel tube where the deep water foundation constructs and steel sheet pile coffer technology, cave of base peg construction and oblique rock treatment method; rhombus cradle construction technology of girder construction, their hydraulic pressure walk system and load text, etc.; water crane barge of girder 0# and lower the temperature and maintaining measure, close section construction of the girder, etc. The construction technology experience of this bridge are suitable for the similar bridge construction.
作者 郑烨
机构地区 中铁第二十五局
出处 《企业技术开发》 2006年第3期5-7,共3页 Technological Development of Enterprise
关键词 预应力混凝土 连续箱梁 挂篮 悬臂施工 深水基础 prestressed concrete continuous box girder cradle cantilever construction deepwater foundation
  • 相关文献

参考文献1

  • 1GB 50010-2002.混凝土结构设计规范[S]..2002

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部