详细介绍了深圳妈湾发电厂机组滑参数停机、强制冷却的方法及过程。与传统的自然冷却相比,该方法大大缩短机组停机后的冷却时间,为提早进行机组检修创造了条件,值得国内其它电厂借鉴。
In this paper, thc opcration proccss of variablc-paramcter shutdown and forccd cooling of 300 MW units in Mawan Power Station is described at length, Compared with the traditional method of turbine natural cooling, forced cooling significantly shortens the post-shutdown cooling time and enables earlier maintenance of units.
出处
《广东电力》
2006年第1期42-45,共4页
Guangdong Electric Power
关键词
发电厂
机组
滑参数停机
强制冷却
power plant
unit
shutdown with variable parameters
forced cooling