多项目、跨地域大型工程的协调管理体系探讨 被引量:4

下载PDF
导出
摘要 结合某大型输油管道工程的管理实践,分析多项目、跨地域大型工程(MP&GDP)所面临的协调管理问题,传统的项目管理方法和手段在MP&GDP管理中遇到的新的挑战,研究多项目、跨地域条件下管理体系运行机制和协调创新体制,提出MP&GDP协调管理的新思路。
作者 赵道致 魏灿
出处 《科技管理研究》 CSSCI 北大核心 2006年第2期110-113,共4页 Science and Technology Management Research
基金 建设部科学技术计划项目(03-5-061)
  • 相关文献

参考文献11

  • 1Suvi Elonen, Karlos A Artto. Problems in managing internal development projects in multi - project environments [J]. International Journal of Project Management, 2003, 21 : 395 -402.
  • 2Nguyen Duy Long, Stephen Ogunlana, Truong Quang, Ka Chi Lain.Large construction projects in developing countries : a case study from Vietnam [J]. International Journal of Project Management, 2004,22:553 - 561.
  • 3Boberto Evaristo, Paul C van Feneroa. A typology of project management: emergence and evolution of new forms [J]. International Journal of Project Management, 1999, 17 (5) : 275 -281.
  • 4Micael Hammer, Steven Stanton. How process enterprises really work [J]. Harvard Business Beview, 1999, ( 11 - 12) : 108-118.
  • 5邢以群,郑心怡.一种新的多项目管理模式——流程导向型组织结构模式探讨[J].软科学,2003,17(4):42-45. 被引量:51
  • 6Wiley V D, Deekro R F, Jackson J A. Optimization analysis for design and planning of multi - project programs [J]. European Journal of Operational Research, 1998, 107 (2) : 492 - 506.
  • 7Ghomismtf, Ashjarib. A simulation model for multi - project resource allocation [J]. International Journal of Project Management,2002, 20 (2): 127-130.
  • 8Hendriks M H A, Voeten B, Kroep L. Human resource allocation in multi- project R&D environment [J].Interanational Journal of Project Management, 1999, 17(3):181 - 188.
  • 9Speranza M G, Vercellis C. Hierachical models for multi - project planning and scheduling [J]. European Journal of Operational Research, 1993, 64 (2): 312-325.
  • 10Lova A. Tormos P. Analysis of scheduling schemes and heuristic roles performance in resource - constrained multi - project scheduling [J]. Annals of Operations Research, 2001, 102 (2) : 263- 286.

二级参考文献11

  • 1Bart R Meijer.From Functional Organizations to productoriented Organizations:A Design Methodology[J].Engineering Management Society ,Proceedings of the 2000,IEEE:357-362.
  • 2G Morgan.From Bureaucracies to Networks:The Emergence of New Orgnizational Forms[A].Creative Organizational Theory:A Resource Book[M].Reprinted by permission of Sage Publication,Inc, 1989.64-67.
  • 3Zohar Laslo,Albert I Goldberg. Matrix Structures and Performance:The research for Optimal Adjustment to Organizational Objectives [ J ]. IEEE Transactions on Engineering Management.2001,48(2): 144-156.
  • 4Micael Hammer, James Champy . Reengineering the Corporation:A Manifesto for Business Revolution[M].NewYork:Harper Business,1993.
  • 5Michael Hammer,Steven Stanton.How Process Enterprises Really Work[J].Harvard Business Review,1999,(11-12):108-118.
  • 6Cherkassky B V, Goldberg A V. On implementing push-relabel method for the maximum flow problem[J] . Algorithmica, 1997, 19: 390-410.
  • 7Kurtulus I, Davis E W. Multi-project scheduling: Categorization of heuristic rules performance [J].Management Science, 1982, 28 (2): 161-172.
  • 8Kurtulus I, Narula S C. Multi- project scheduling: Analysis of project performance [J] . IIE Transactions, 1985, 17 (1): 58-66.
  • 9M hring R H, Schulz A S, Stork F, Uetz M. Resource constrained project scheduling: Computing lower bounds by solving minimum cut problems [R] . Berlin: Technische Universit te Berlin, 1998.
  • 10Tsai D M, Chiu H N. Two heuristics for scheduling multiple projects with resource constraints [ J ] .Construction Management and Economics, 1996, 14: 325-340.

共引文献62

同被引文献23

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部