摘要
水口水电站的过船建筑物由一线2×500t级升船机和一线2×500t级三级船闸组成。升船机为湿运全平衡钢丝绳卷扬提升垂直升船机,于2005年4月8日开始试通航,是我国目前建成投运的规模最大的垂直升船机。该升船机的成功投运,在提高通航能力、节水发电、节省运费、增加通航可靠性等方面都发挥出其显著的经济与社会效益,也为我国大型垂直升船机的设计提供了技术依据和有益的实践经验。
The navigation facilities at the Shuikou hydraulic station comprise a one-way 2x500-ton ship llft and a oneway three-flight ship lock. The wet full balanced wire rope hoist vertical ship lift, which succeeded trial navigation on April 8, 2005, is the largest ship lift in China at present. The successful commissioning of the ship lift improves the economic and social benefits on the areas of improvement of navigation efficiency, water conservation in power generation, saving the transport expense and increase of the navigational reliability. In the meantime, it also provides technical reference and practical experience for the design of a great ship llft.
出处
《水力发电》
北大核心
2006年第1期50-51,共2页
Water Power
基金
"九五"国家重大技术装备研制项目(97-312-03-8)部分内容
关键词
升船机
湿运
全平衡
垂直提升式
水口水电站
ship lift
running with water(wet)
full balanced
vertical
Shuikou Hydropower Station