摘要
我国水电工程机电设计、安装和制造技术已逐步赶上和达到世界一流水平,回顾我国水电开发的发展过程,介绍了近年来我国大型水电站规划设计简况、机组国产化进程以及水电站机电设备近年来选型的新特点和新趋势。为迎接水电开发的历史机遇和挑战,取得双赢,对国内、外制造厂家的期望和要求。
The paper reviews a survey of hydropower development in China, forecasts the magnificent prospects of hydropower development within new century, points out that the technology of design, installation and manufacture of electromechanical engineering of hydropower project in China and catches up with and reaches gradually world' s first-class level, presents the general situation of the planning and design for large-scale hydropower stations in China, localization proceeding of generating units, and up-to-date characteristics and new trend of selecting of hydropower eleetromeehanical equipment in recent years, raises the expectation and suggestions for meeting historical opportunity and challenge of Chinese hydropower development and for the benefits of win-win for manufacturers at home and abroad.
出处
《水力发电》
北大核心
2006年第1期64-67,共4页
Water Power
关键词
水电工程
机电技术
设备制造
国产化
hydropower project
electromechanical technology
equipment manufacturing
localization