葛洲坝电站机组增容改造综述 被引量:7

The Summarize of Alteration and Capacity-Increasing in Gezhouba Hydropower Station
下载PDF
导出
摘要 葛洲坝水电站的水轮发电机组投产运行20多a以来,机组长期处于满负荷工况下运行,年平均运行小时数高达6 500 h以上,相当于其他水电站机组运行30多a。目前机组设备及其部件的老化现象严重,故障率不断上升,严重地影响着电力生产的安全运行。电站通过分析、研究,决定在进行设备改造检修的同时,将125 MW机组增容至146 MW,既实现了设备的更新换代,又适应了三峡工程建成后的联合运行。 The hydro-generating sets of Gezhouba Hydropower Station have already operated for more than 20 years. The average runtime of the generating set is up to 6500 hours every year, which equals to other power stations running for more than 30 years. The aging of generating set and its parts is serious, which influences the safe operation of generating set. We decided to increase the capacity of generating set from 125MW to 146MW, while carrying on the alteration of the equipment to overhaul by analyzing, comparing and studying. This not only achieves the update of the equipment but also adapts to the combination operation with the hydro-generating sets of Three Gorges Hydrepower Station after the completion of Three Gorges Project.
出处 《水力发电》 北大核心 2006年第1期80-83,共4页 Water Power
关键词 水轮发电机组 增容改造 设备更新 葛洲坝电站 hydro-generating set capacity-increasing transformation update of the equipment Gezhouba Hydropower Station
  • 相关文献

参考文献3

共引文献5

同被引文献50

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部