中承式钢管混凝土拱桥维修加固工艺设计技术 被引量:5

MAINTENANCE AND REINFORCING PROCESS DESIGN FOR HALF-THROUGH CONCRETE-F ILLED STEEL TUBULAR TRUSS ARCH BRIDGE
下载PDF
导出
摘要 以蜀河汉江大桥维修加固工程为例,从拱肋横向稳定性加固、横梁加固、更换新吊杆、拱肋和拱脚腹板填实、拱肋腹板除湿泥、拱肋涂装工艺设计技术等诸方面,介绍了中承式钢管混凝土拱桥维修加固的工艺设计技术,供广大维修加固工程技术人员参考。 It is introduced the maintenance and reinforcing technology for the half, through concrete-filled steel tubular truss arch bridge,Han River Bridge is used as an example,including the reinforcing process for arch rib transverse stability, maintenace process for beam, replacing new suspender, infilling process for arch rib and web plate of the abut, removing wet mud in web plate of the abut, painting process for arch rib, these may provide some references for the engineers majoring in maintenance and reinforcing work.
出处 《钢结构》 2006年第1期34-36,45,共4页 Steel Construction
关键词 中承式钢管混凝土拱桥 维修加固 工艺设计技术 half-through concrete-filled steel tubular truss arch bridge maintenance and reinforcing process design
  • 相关文献

参考文献2

二级参考文献1

  • 1川口卫.日本索结构设计规程及说明[Z].日本建筑学会,1994..

共引文献8

同被引文献17

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部