摘要
分析了工程变更产生的原因和受理程序,提出了有关工程变更的管理、处理原则和控制造价的具体措施,强调要加强对变更项目的监督检查。
This paper analyzes on the causes of the engineering variation and its accepting procedures, puts forward some concrete measures for managing and treating principles for the engineering variation and controlling the construction cost, and emphasizes that the supervision and examination on the varied items should be strengthened.
出处
《科技情报开发与经济》
2006年第2期196-197,共2页
Sci-Tech Information Development & Economy
关键词
工程建设
工程变更
受理程序
处理原则
造价控制
engineering construction
engineering variation
accepting procedures
treating principles
construction cost control