期刊文献+

带压开孔管道极限弯矩的试验研究 被引量:1

An experimental study on limit moment of hot tapping pipelines
下载PDF
导出
摘要 设计了2台带压开孔管道结构,采用与带压开孔中相同的焊接工艺制造模型。对模型支管在横向和纵向弯矩作用下结构的极限弯矩进行了试验研究。结果表明:支管和主管相贯区受拉侧关键点的极限弯矩值最小,此处为结构的危险区域;在结构尺寸和材料相同的情况下,承受纵向弯矩模型的极限弯矩大于承受横向弯矩的模型,二者的比值约为1.7;此外,对通过不同方法得到的极限弯矩值进行了比较,表明可以由载荷位移法代替载荷应变法确定结构的极限弯矩。 Two hot tapping pipeline structures are designed, a modelfor fabrication and welding used is the same with that in hot tapping. An experimental study is conducted on the limit moment of branch pipe under the lateral and longitudinal moment loads. The result shows that for the branch and main pipes, the minimum limit moment is at the critical points on the extended side of pipe-nozzle intersection area, where is the area of danger, under the conditions of same structural size and the same materials, the limit moment of the longitudinal moment model is bigger than that of lateral moment model, the ratio of limit moment between the 2 models is 1.7. Meanwhile the limit moments obtained from different models are compared. The result indicates that load-displacement method can be used to achieve the limit moment of structure instead of load-strain method.
出处 《石油机械》 北大核心 2006年第3期28-31,86,共4页 China Petroleum Machinery
基金 中国石油化工集团公司科技发展资助项目(304001)。
关键词 带压开孔管道 极限弯矩 载荷-位移法 载荷-应变法 试验研究 hot tap, limit moment, load-displacement method, load-strain method, experimental study
  • 相关文献

参考文献5

  • 1Mcelligott J A,Delanty J,Delanty B.Use of hot taps for gas pipelines can be expanded.Oil and Gas Joumal,1998,96(48):66~68,73~76
  • 2Sabapathy P N,Wahab M A,Painter M J.The prediction of burn-through during in-service welding of gas pipelines.International journal of Pressure Vessels and Piping,2000,77:669~677
  • 3薛小龙,桑芝富,姜卫忠.带压开孔结构多道间断焊的数值模拟[J].焊接学报,2005,26(4):25-28. 被引量:7
  • 4章为民,陆明万,张如一.确定实际极限载荷的零曲率准则[J].固体力学学报,1989,10(2):152-160. 被引量:48
  • 5.JB4732-95 钢制压力容器分析设计标准[M].北京:中国标准出版社,1995..

二级参考文献11

  • 1汪建华,钟小敏,戚新海.管板接头三维焊接变形的数值模拟[J].焊接学报,1995,16(3):140-145. 被引量:23
  • 2Ribicky E F, Schmueser D W,Stonesifer R W, et al. A finite-element model for residual stresses and deflections in girth-butt welded pipes[J]. ASME Journal of Pressure Vessel Technology, 1978, 100(8): 256 -262.
  • 3Kim W S, Kin Y P, Oh K H. The effects of heat input and gas flow rate on weld integrity for sleeve repair welding of in-service gas pipelines[A]. Proceedings of the international pipeline conference[C], Canada, 2002, (B): 1483-1492.
  • 4Cant R R. The making of a permanent hot tap connection[J]. Pipeline and Gas Journal, 2000, 227(8): 16-20, 22-24.
  • 5Goodfellow R, Belanger R. Hot tap installed on operating sour-gas line [J]. Oil and Gas Journal, 2001, 99(12): 50 -55.
  • 6Hutt G, West A, Starsmore R. Hot tapping on a subsea pipeline [J]. Welding and Metal Fabrication, 1995, 63(4): 136 -139.
  • 7Nemoto M, Susa M. Hot tap method developed for heating, cooling pipe[J]. Pipe Line Industry, 1992, 75(1): 64 -65.
  • 8Sabapathy P N, Wahab M A, Painter M J. The prediction of burn-through during in-service welding of gas pipelines[J]. International Journal of Pressure Vessels and Piping, 2000, 77: 669 -677.
  • 9Artem P. Computer simulation of residual stress and distortion of thick plates in multi-electrode submerged arc welding and their mitigation techniques[D]. Trondheim: Norwegian University of Science and Technology,2001.
  • 10Bang I W, Son Y P, Oh K H, et al. Numerical simulation of sleeve repair welding of in-service gas pipelines[J]. Welding Journal, 2002, (12): 273-282.

共引文献53

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部