摘要
介绍上海东方明珠广播电视塔钢天线桅杆同步整体提升所采用的新方法──钢铰线承重、提升器集群、计算机控制、液压同步提井法.
This paper presents a new method for the synchronizing lift for the integrated steel anterma mast of Shanghai 'Bright Oriental Pearl' Radio & TV Tower, that is, strand loading, cylinder group, computer control and hydraulic synchronizing.
出处
《同济大学学报(自然科学版)》
EI
CAS
CSCD
1996年第1期44-49,共6页
Journal of Tongji University:Natural Science
关键词
电视塔
天线桅杆
钢结构
同步提升
计算机
TV tower
Antenna mast
Computer control
Hydraulic control
Synchronizing lift