摘要
通过对沈阳地铁一号钱施工期产生的环境影响综合分析,研究该项目在建设中产生的噪声、振动、废水、废气及固体废弃物等污染物产生的规律和发生量,并提出缓解和控制环境影响的措施。
The paper analyzed synthetically the environmental impact that is produced in construction time of under ground No. one of Shenyang, studied the generant rule and quantity of pollutants such as noise, vibration, waste water, waste gas and solid offal and etc. , proposed eonutermeasures to alleviate and control environmental impact.
出处
《环境保护科学》
CAS
2006年第1期67-70,共4页
Environmental Protection Science
关键词
生态类型影响项目
施工期
对策措施
Ecology Influenced Project
Construction Time
Countermeasure