摘要
分析了贵阳市西出口线改造前存在的问题,介绍了针对存在问题进行改造的工程要求,在工程的总体设计中体现了解决问题的具体措施。
Problems existing in the west exit trunk in the city of Guiyang were analyzed prior to its reconstruction, with the engineering requirements thereof,and measures are provided in the overall design of the project to solve specific problems.
出处
《中国市政工程》
2006年第1期10-11,共2页
China Municipal Engineering