摘要
介绍了深圳市芙蓉大桥桥型方案的选择,桥梁结构设计技术标准。详细叙述了主桥的设计主要内容,施工加载顺序及主要施工阶段稳定分析数据,为类似桥梁的结构设计提供了成功的经验。
Described hereby are the bridge style selection and the technical standard for structural design of Furong Bridge,with details of the main bridge design,the loading sequence in construction and the data from stability analysis in major construction stages,which provides successful experience in the structural design of similar bridges.
出处
《中国市政工程》
2006年第1期28-29,共2页
China Municipal Engineering
关键词
钢管混凝土
拱桥
计算
深圳市
芙蓉大桥
concrete filled in steel tubular
arch bridge
calculation