摘要
介绍了YG-75/3.82-M1型循环流化床锅炉冷态试验,并对冷态试验数据进行了分析,提出了该炉调试启动的技术要点。
A cold state test of a YG-75/3.82-M1 type circulating fluidized bed boiler is being described, with an analysis of the test date and hints concerning main points of boiler adjustment and starting.
出处
《发电设备》
2006年第2期113-115,共3页
Power Equipment
关键词
能源与动力工程
循环流化床锅炉
冷态试验
启动
energy and power engineering
circulating fluidized bed boiler
cold state test
starting