摘要
文中主要从张峰水库输水线路总干地形地貌及物理地质现象、水文地质、地质构造与地震及工程区地质条件诸方面对该水库总干线路工程地质条件进行了简要论述。
In this paper, the engineering geology condition of general delivery line of Zhangfeng Reservoir is introduced briefly from many aspects such as : topography, geomorphy, physical geologic appearance, geohydrology, geologic structure, earthquake and geologic condition of project area.
出处
《山西水利科技》
2006年第1期26-27,共2页
Shanxi Hydrotechnics
关键词
输水线路总千
地形
地貌
物理地质现象
水文地质
地质构造
地震
general delivery line topography geomorphy physical geologic appearance geohydrology geologic structure earthquake