摘要
该文介绍了如何利用高压高炉的煤气压力提高管网压力以减少煤气加压机的运转率或不建煤气加压站,可节省大量电能降低煤气成本。
The contribution introduces utilising gas pressure of high pressure blast furnaces to increase pipes network pressure so as to decrease operation rate of gas pressuring machines or not to build gas pressuring stations. Thus, much electric energy may be saved and gas cost may be decreased.
出处
《冶金动力》
1996年第1期60-62,共3页
Metallurgical Power
关键词
高炉煤气
余压利用
Gas of blast furnace, Remaining gas pressure, Porcess improvement