主厂房布置模块化设计优化 被引量:13

An Optimization Design of Module in the Lay out of Main Building
下载PDF
导出
摘要 主厂房是电厂的核心建筑,主厂房布置是设计优化的重点。本文结合华能上安电厂2×600MW国产超临界空冷机组的设计投标的成果,按照模块化设计的思路,在合理模块划分的基础上,对模块逐个进行优化,分析每个模块的技术特点、经济性和适用性,在此基础上进行模块优化组合,形成各具特点的主厂房方案,并通过经济技术比选,提出本工程的最优设计方案。 The main building is the core building of power plant, and the arrangement of the main building is the emphases of the optimization on engineering. According to the consideration of modularizing engineering under the proper module separation, this paper takes the design bidding result of 2 x 600MW home - made supercritical aircooling units in Huaneng Shangan power plant, optimizing and analyzing each module's technical characteristic, economics and applicability, and combining each module with different application together to form the main building schemes with it's own -character, finally through technical and economic comparison, put forward the optimized engineering schemes for this projecL
出处 《电力勘测设计》 2006年第1期54-59,共6页 Electric Power Survey & Design
关键词 主厂房布置 模块化 设计优化 main building modularization design optimization.
  • 相关文献

同被引文献80

引证文献13

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部