黄河龙羊峡水电站工程地质勘察概述 被引量:9

Summarization about Engineering Geological Investigation for Longyangxia Hydropower Station on the Yellow River
下载PDF
导出
摘要 龙羊峡水电站是黄河上游第一座梯级电站,坝高库大,工程地质条件复杂,工程勘察主要完成于上世纪80年代,本文介绍了该水电站区域稳定性与水库诱发地震、近坝库岸稳定与滑坡涌浪、坝址区工程地质、水文地质及岩土工程勘察工作的主要内容与经验。 Longyangxia Hydropower Station is the first step power station in the upper area of the Yellow River. The dam is very large and high, and the geological conditions are complex. The geotechnical investigation was mainly completed in 1980' s. The main working contents and experiences about the regional stability, the earthquake induced by the reservoir, the stability of the bank near the dam, the surge induced by landslides, the engineering geology, the hydrogeology and the geotechnical investigation in the dam area are introduced.
出处 《工程勘察》 CSCD 北大核心 2006年第3期37-44,共8页 Geotechnical Investigation & Surveying
关键词 龙羊峡 水电站 工程地质 勘察 Longyangxia hydropower station engineering geology investigation
  • 相关文献

参考文献6

  • 1余仁福,柳培坤.龙羊峡水电工程区域稳定和地震活动研究.黄河龙羊峡水电站勘测设计重点技术问题总结,第一卷.北京:中国电力出版社,1998.
  • 2庆祖荫.龙羊峡水电站近坝库岸稳定及滑坡涌浪评价.黄河龙羊峡水电站勘测设计重点技术问题总结,第一卷.北京:中国电力出版社,1998.
  • 3李天扶.龙羊峡水电站坝址勘测工作总结.黄河龙羊峡水电站勘测设计重点技术问题总结,第二卷.中国电力出版社,2003.
  • 4王志硕.龙羊峡水电站坝区岩体地下水问题总结.黄河龙羊峡水电站勘测设计重点技术问题总结,第二卷.中国电力出版社,2003.
  • 5水利电力部西北勘测设计院.黄河龙羊峡水电站技术设计,第三卷,工程地质.1986.
  • 6国家电力公司西北勘测设计研究院.黄河龙羊峡水电站工程安全鉴定设计自检报告.1999.

同被引文献42

引证文献9

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部