摘要
本文应用一个含抽水蓄能电站的系统评价模型及软件,对上海电网2000年调峰电源进行了优化基础上的规划运行分析。文中提出,像上海电网这样的纯火电系统建设燃气轮机解决调峰问题,具有极大的经济性和可靠性。
In this paper using a systematic evaluationmethod in which the pumped-storage power station is included,the planning and operation analysis for peak regulating power station of Shanghai power system in 2000 is described. The results show that significant economy and reliability can be achieved by installing gas turbine plants forpeak load regulation in such a pure thermal system as inShanghai. Valuable conclusions are obtained by further analysis and comparison between the single-cycle and combinedcycle gas turbine plants.