根据深圳湾公路大桥悬臂拼装实践,介绍了该桥0#块精确对位的方法、工艺及设备,保证了该桥悬臂拼装的顺利进行。
In the light of the construction practice in cantilever assembling the Shenzhen Bay Bridge, the paper introduces the method, processes and equipment for the precisely aligning construction of the bridge of Section 0^# , which ensured the success of its cantilever assembling operation.