摘要
电缆涵管穿越铁路线,采用顶管施工技术,在不开挖地面的情况下,顶进涵管,缩短了工期,保证了工程质量,确保铁路线正常运行。
The cable culvert crosses of without excavating the ground, Making a railway, construction of making the culvert in, In the condition the culvert in, Decrease the construction time , Ensuring the works' quality, Ensuring the railway' s regular moving.
出处
《安徽冶金科技职业学院学报》
2006年第1期45-47,共3页
Journal of Anhui Vocational College of Metallurgy and Technology
关键词
顶管
施工控制
管节减摩
Making the culvert in
Construction controlling
Decrease the friction of joint.