摘要
杭州地铁1#线沿线的地质环境、水文环境及周边人文环境复杂,涉及的岩土工程问题有较大的差异。针对沿线的高架车站区间段、明挖车站及隧道区间段和暗挖隧道区间段的岩土工程问题进行分析,为地铁1#线的勘察设计和施工提供参考。
Hangzhou metro line No. 1 project is encountered with complex problems of geology, hydrogeology, and anthropogenic surroundings. Based on the characteristics of the overhead stations, open excavation and excavation running tunnel, the main geotechnical preambles are analyzed, which may provide valuable references to engineering geology investigation, design, and construction.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2005年第A02期5680-5685,共6页
Chinese Journal of Rock Mechanics and Engineering
关键词
隧道工程
杭州地铁1^#线
工程地质勘察
岩土工程问题
tunneling engineering
Hangzhou metro line No.1 geological engineering investigation
geotechnical problems