摘要
南埔电厂煤码头工程设计中,经充分论证泥沙、地质、码头结构和电厂建设等条件,在福建首次大胆采用挖入式港池,较好解决了码头营运、电厂建设中的难点,并充分利用码头岸线资源,节省工程投资。
In Nanpu Power Plant wharf engineering design, based on sufficient demonstration on the conditions of sand, geology, wharf structure and power plant construction, scheme of dig-in basin was adopted for the first time in Fujian, by which, some technical difficulties in wharf operation and power plant construction were successfully resolved, quayline resource was fully utilized, and engineering investment was cut down.
出处
《水运工程》
北大核心
2006年第3期28-31,39,共5页
Port & Waterway Engineering