摘要
以台山发电厂一期工程1号、2号机组辅助车间(BOP)集中控制网为例,阐述了发电厂BOP集中控制网的控制方式、物理拓扑结构、逻辑拓扑结构和应用软件结构,并就BOP集中控制网的实施提出应注意的问题。
Taking the balancc of plant (BOP) for Units 1 and 2 in Phase- I Project of Taishan Power Station for example, this paper elaborates on the control means, physical topological structure, logical topological structure and application software structure. Points for attention concerning the implementation of the centralized control network of BOP arc prcscnted as well.
出处
《广东电力》
2006年第2期55-58,共4页
Guangdong Electric Power
关键词
发电厂
辅助车间
集中控制
网络
power plant
balance of plant (BOP)
centralized control
network